Sunday 21 February 2016

Progress report

Quote a lot has happened recently.

The exhaust hoses are 3/4 fitted
The raw water inlet plumbing has been started
The front cockpit fit out is well along the way
The steering hoses have been secured for about 50% of the run
The dashboard is in and the steering pump fitted and bleed.  I have working steering now.

I have been agonizing over the fuel tank again.  I had pretty much convinced myself to buy a new one but the best quote I have had was for $640 + GST and freight. So back to agonizing over it some more.

Had one of those middle of the night thoughts. The stroke of the throttle unit I have recently bought might not be the same at the stroke of the engine throttle.  Turns out I am right is about 2.6:1 so now I need to locate or manufacture a ratio adjuster. Another thing added to the to do list.

And lastly some progress photos