Saturday, 24 August 2013

Nails & Screws, Bandsaws & veneers

I have had a pretty productive week or so.

I'm close to finishing putting all the nails and screws in.  Only about 80 screws to go.  Lost count of how many I have put in,  for nails it must be over a thousand and for screws something like 500.  Had a bit of trouble with them today, not sure why, but managed to strip the head of about 20.  Got really good at getting them out quickly using a ezy-out.

I have also bought a new blade for my band-saw.  I had a little oops as I was setting it up and the blade bit into the table, but it still seems to cut okay.  So I spent an hour practising cutting veneers.  My test pieces were only about 800mm long, and the real trick will be the 3m long pieces, but so far so good.

I then ran my practise pieces through the thicknesser and have ended up with some nice examples at about 4.2mm thick.

Tomorrow will be finishing screwing,  filling up a few holes that were "misses" and generally preparing for putting the seal coats on.

This means that next week I should be full steam into veneer manufacture.  I don't have a lot of timber for that at the moment, but enough to get me going.


No comments:

Post a Comment