I have been a but slack with posting lately.
I am well into the next layer of ply. I have had a bit of trouble with that as the ply is not very good. It snaps easily when trying to ger around the curves at the transom.
I have got both sides done from frame 0 to about frame 6. I have also made a start on the bottom.
I also spent nearly all of Saturday relocating and rebuilding my mark out table into a workbench configuration with a number of shelves to store tools etc. I also found I was hoarding a lot of off cuts and so have given them over for fire wood.
The driver behind this was I was running out of space. With the addition of table saw, compressor, engine crane, engine and more recently the bandsaw there was no room to move. With the exception if the engine, most of the above is pretty mobile, so my new layout gives room to move these things about as required. It also means I can do more with the garage door closed.
No comments:
Post a Comment